The deck has come up clean |
Brightener has brought back the colour |
Were all done ready to start enjoying the season |
The deck has come up clean |
Brightener has brought back the colour |
Were all done ready to start enjoying the season |
Teak Deck cleaned and brightened |
Transom and Step cleaned and brightened |
Slow trundle down to the water, looking a lot cleaner than when she came out |
Quick wash down of the yard dust and GP is looking clean & shinny |
Back on her mooring, glad all the hard work is done. |
Greek Princess looking super clean again for another season |
Port Side |
Starboard Side |
Very pleased with the end result |
GP always comes up so well after a bit of TLC |
Relaunch scheduled for next Wednesday |
Very pleased with the stern, looks like new |
Fully polished and taped up for anti-foul |
Can see then end of the job now |
Starboard side looking good |
Port side looking good |
Hull come up well |
Stern all polished |
Greek Princess looking good after a lot of work |
All the decals on |
Anodes all on |
All sprayed up |
All running fine |
Just finishing touches to go then I can get the polishing and anti-foul done. |
Finally all back together after two weeks of graft stripping out the damage housing and replacing |
New Bell housing has arrived just awaiting new bushes, welded the old one as a backup |
Alpha One Gen 2 leg back together |
All ready for the return to the boat |
Propped sanded down |
Water pump housing sanded down |
Inside housing sanded |
All ready for reassembly |
Upper housing primed |
Primer on ready for reassembly |
Gimble housing finally off |
This was a real struggle |
Stripped down the large hole shows |
Clearly damage some how |
Missing piece found in the leg |
Hopefully I can get this welded |
Once the leg was off it revealed a hole |
The casting had a large hole and crack |
Leg now off, I will need to come back to strip out the gimble housing |
Rib arriving the move the boat |
Strapping Greek Princess along side |
Taken off the mooring |
All clear |
Struggling up the run in the wind |
Were on our way |
Heading under Haslar Bridge |
Out the other side not far now |
Arrival at the slip |
Roger takes charge from Seaway Marine |
Getting the lift down the slip |
Getting Greek Princess on the lift |
Lifting gear in place |
Clearing the water |
Off to the yard |
Shes looking dirty on the bottom |
Cleaning Off |
Getting shot of the weed |
Finally into the yard |
Blocked Off ready for the work |