![]() |
| The deck has come up clean |
![]() |
| Brightener has brought back the colour |
![]() |
| Were all done ready to start enjoying the season |
![]() |
| The deck has come up clean |
![]() |
| Brightener has brought back the colour |
![]() |
| Were all done ready to start enjoying the season |
![]() |
| Teak Deck cleaned and brightened |
![]() |
| Transom and Step cleaned and brightened |
![]() |
| Slow trundle down to the water, looking a lot cleaner than when she came out |
![]() |
| Quick wash down of the yard dust and GP is looking clean & shinny |
![]() |
| Back on her mooring, glad all the hard work is done. |
![]() |
| Greek Princess looking super clean again for another season |
![]() |
| Port Side |
![]() |
| Starboard Side |
![]() |
| Very pleased with the end result |
![]() |
| GP always comes up so well after a bit of TLC |
![]() |
| Relaunch scheduled for next Wednesday |
![]() |
| Very pleased with the stern, looks like new |
![]() |
| Fully polished and taped up for anti-foul |
![]() |
| Can see then end of the job now |
![]() |
| Starboard side looking good |
![]() |
| Port side looking good |
![]() |
| Hull come up well |
![]() |
| Stern all polished |
![]() |
| Greek Princess looking good after a lot of work |
![]() |
| All the decals on |
![]() |
| Anodes all on |
![]() |
| All sprayed up |
![]() |
| All running fine |
![]() |
| Just finishing touches to go then I can get the polishing and anti-foul done. |
![]() |
| Finally all back together after two weeks of graft stripping out the damage housing and replacing |
![]() |
| New Bell housing has arrived just awaiting new bushes, welded the old one as a backup |
![]() |
| Alpha One Gen 2 leg back together |
![]() |
| All ready for the return to the boat |
![]() |
| Propped sanded down |
![]() |
| Water pump housing sanded down |
![]() |
| Inside housing sanded |
![]() |
| All ready for reassembly |
![]() |
| Upper housing primed |
![]() |
| Primer on ready for reassembly |
![]() |
| Gimble housing finally off |
![]() |
| This was a real struggle |
![]() |
| Stripped down the large hole shows |
![]() |
| Clearly damage some how |
![]() |
| Missing piece found in the leg |
![]() |
| Hopefully I can get this welded |
![]() |
| Once the leg was off it revealed a hole |
![]() |
| The casting had a large hole and crack |
![]() |
| Leg now off, I will need to come back to strip out the gimble housing |
![]() |
| Rib arriving the move the boat |
![]() |
| Strapping Greek Princess along side |
![]() |
| Taken off the mooring |
![]() |
| All clear |
![]() |
| Struggling up the run in the wind |
![]() |
| Were on our way |
![]() |
| Heading under Haslar Bridge |
![]() |
| Out the other side not far now |
![]() |
| Arrival at the slip |
![]() |
| Roger takes charge from Seaway Marine |
![]() |
| Getting the lift down the slip |
![]() |
| Getting Greek Princess on the lift |
![]() |
| Lifting gear in place |
![]() |
| Clearing the water |
![]() |
| Off to the yard |
![]() |
| Shes looking dirty on the bottom |
![]() |
| Cleaning Off |
![]() |
| Getting shot of the weed |
![]() |
| Finally into the yard |
![]() |
| Blocked Off ready for the work |