![]() |
The deck has come up clean |
![]() |
Brightener has brought back the colour |
![]() |
Were all done ready to start enjoying the season |
![]() |
The deck has come up clean |
![]() |
Brightener has brought back the colour |
![]() |
Were all done ready to start enjoying the season |
![]() |
Teak Deck cleaned and brightened |
![]() |
Transom and Step cleaned and brightened |
![]() |
Slow trundle down to the water, looking a lot cleaner than when she came out |
![]() |
Quick wash down of the yard dust and GP is looking clean & shinny |
![]() |
Back on her mooring, glad all the hard work is done. |
![]() |
Greek Princess looking super clean again for another season |
![]() |
Port Side |
![]() |
Starboard Side |
![]() |
Very pleased with the end result |
![]() |
GP always comes up so well after a bit of TLC |
![]() |
Relaunch scheduled for next Wednesday |
![]() |
Very pleased with the stern, looks like new |
![]() |
Fully polished and taped up for anti-foul |
![]() |
Can see then end of the job now |
![]() |
Starboard side looking good |
![]() |
Port side looking good |
![]() |
Hull come up well |
![]() |
Stern all polished |
![]() |
Greek Princess looking good after a lot of work |
![]() |
All the decals on |
![]() |
Anodes all on |
![]() |
All sprayed up |
![]() |
All running fine |
![]() |
Just finishing touches to go then I can get the polishing and anti-foul done. |
![]() |
Finally all back together after two weeks of graft stripping out the damage housing and replacing |
![]() |
New Bell housing has arrived just awaiting new bushes, welded the old one as a backup |
![]() |
Alpha One Gen 2 leg back together |
![]() |
All ready for the return to the boat |
![]() |
Propped sanded down |
![]() |
Water pump housing sanded down |
![]() |
Inside housing sanded |
![]() |
All ready for reassembly |
![]() |
Upper housing primed |
![]() |
Primer on ready for reassembly |
![]() |
Gimble housing finally off |
![]() |
This was a real struggle |
![]() |
Stripped down the large hole shows |
![]() |
Clearly damage some how |
![]() |
Missing piece found in the leg |
![]() |
Hopefully I can get this welded |
![]() |
Once the leg was off it revealed a hole |
![]() |
The casting had a large hole and crack |
![]() |
Leg now off, I will need to come back to strip out the gimble housing |
![]() |
Rib arriving the move the boat |
![]() |
Strapping Greek Princess along side |
![]() |
Taken off the mooring |
![]() |
All clear |
![]() |
Struggling up the run in the wind |
![]() |
Were on our way |
![]() |
Heading under Haslar Bridge |
![]() |
Out the other side not far now |
![]() |
Arrival at the slip |
![]() |
Roger takes charge from Seaway Marine |
![]() |
Getting the lift down the slip |
![]() |
Getting Greek Princess on the lift |
![]() |
Lifting gear in place |
![]() |
Clearing the water |
![]() |
Off to the yard |
![]() |
Shes looking dirty on the bottom |
![]() |
Cleaning Off |
![]() |
Getting shot of the weed |
![]() |
Finally into the yard |
![]() |
Blocked Off ready for the work |