Greek Princess 245

Greek Princess 245
Channel Crossing from Guernsey 6th August 2016

Tuesday 14 March 2017

Oil & Filter Change & Leg Completed - 13th/14th March 2017

With the weather being mild, I took advantage to complete the leg by fixing on the anodes and the polished SS prop. I also carried out a full Oil Change on the V8 engine, together with a new Oil Filter and Fuel Filter and replaced oil in the leg. Finally, I bagged up the leg to protect it (prior to launch) so when doing for the final cleaning and polishing it doesn't coat the out drive.


All back together

Just show me the water!

Trim Tab Anodes

MG Duff Anodes fitted

Alpha One leg bagged up

Leg bagged for protection

Saturday 4 March 2017

Steps Refurbished - 3rd March 2017


Repaired step edges

Re stained step tops

























I completed the last of the interior jobs this week, fitting the Standard Horizon Fog Horn/PA speaker/Listening Microphone into the anchor locker, this was a major wiring job which took the whole day. I then sealed the front D Bolt in the bow which had been leaking for sometime and finally removed the broken teak edging on the cabin steps and replaced with new (this had become damaged when the Grand  Kids were very young and use to slide down the steps on their tummy's), I had been putting this job off for years!!